Stage 1 - Remove the workshop and build the retaining walls.
This is a Photoshop representation of what the flat should look like from the road.
Panel lift door installed
100 reconstituted limestone blocks delivered @ 85Kgs each.

The grass is green

Half the grass is green

The grass is gone

New doorway sliced into the rear garage wall

Blocks on east boundary

Blocks on corner

Heading around to the south boundary

Southern boundary

Another view of the mess

Workshop is gone and blocks are double height

View from tin shed in corner with workshop gone.