Stage 7 - Ceilings and cornices in, painting started, floors readied for
tiling and Patio installed.
Another month of action, did some more paving, installed a patio,
installed all the soakwells and Maurie has moved into his workshop.
Inside I have flushed almost all the walls and ceilings, corniced and
painted the ceilings. Also hung a door and readied the bathroom floor
for tiling. On eBay we purchased a timber dining suite which with a
little work will come up nicely.
Patio
Sorry about the photo but a storm was on and I had to use a flash.
The Main Ceiling
Raised up to create a feeling of space.
Bathroom Heater hole.
Robe recess in Bedroom
Bedroom door installed
Laundry
Overhead shelf in and floor levelled for tiling,
fibreglass shower is in the corner.
I think we went to about 30 tile shops before we finally
settled on the ones we got. Photos next month.
Toilet
Lounge TV recess
Solid timber dining suite
and side table which we will cut down to a coffee table. Needs a little
sanding
and a new coat of varnish but looks great. $200 bargain!
Pete the builder.