Stage 9 - This month the kitchen cupboards are finished and I've almost finished the bedroom wardrobes. Sandy has designed the wardrobes so that we can fit all our clothes in the limited space we have. This has included 7 slide out shelves along with short and long hanging space. Pictures next month.

Kitchen cupboards finished

Completed in a dark slate laminate and gloss white.

Sandy has rubbed the dining setting back ready for varnishing.

In my spare time I made Sandy a folding clothes airer.

 

Folded

Semi unfolded

Ready for use

 

We are now using the bathroom and toilet as Charlie has connected all the water and gas.

Sandy has brightened the room with dark red accessories.

 

I should have the wardrobes finished this week and then I will start the storage shelves in the workroom. After that we can clean the dust up and finish the painting and varnishing. Now we start concentrating on the smaller details such as architraves.

Till next month

Peter and Sandy.